The Green Dragon building in the SE Industrial area has long been a hidden away destination. The re-design of the pub, and in particular the courtyard, and re-branding to Rogue Ales gives the long standing brewery an eastside flagship location. Completed 2017.
Credits: Steelhead Architecture, DSL Builders, Josh Partee Photography